Inspection And Issue Of Safety Approvals

After obtaining drawing approval, erection work shall be executed strictly as per the approved drawings. Upon completion of work, a completion report from the Licensed Electrical contractor (enlisted with HP Electrical Inspectorate) in the prescribed form along with requisite challan in original towards inspection fee paid be forwarded to the Inspectorate. The details of the connected load, calibration reports, site test results, equipment manufacturer testing reports, etc. shall be sent by the owner of the installation to the Electrical Inspectorate for inspection along with the aforesaid documents.

At the time of inspection a responsible representative of the consumer, Electrical supervisor and a representative of the contractor should be present with their licence, permit and testing instruments. The defects pointed out during the inspection should be rectified in order to bring the installation in general conformity with the I E Rules, 1956, and BIS specifications and a rectification report signed by the consumer and contractor should be sent to the Electrical Inspectorate. After verification of the compliance report by the inspecting officer, safety approval will be granted under Rule 47A, 50A, 51(3) & 63 or any other relevant rule of I.E Rules, 1956 respectively.



Download All Forms of Department of Electrical Inspectorate


All Fees of Department of Electrical Inspectorate can be remitted through e-treasury Portal

About Us

Quick Menu

Contact Us

Sda Complex,Block No.29 Kasumpti,Shimla-171009 (Get Direction )

0177-2621020

ceihp@rediffmail.com