Please 'Click' On link given Below To open the file or 'Right click' on Link and Choose "Save target as" option to save It.
Before filling out the forms supplier/ owner/ consumer are advised to ensure that all fields are filled properly in forms and enclose/submit all relevant documents. The supplier/ owner/ consumers are also advised to carefully review the “Schedule” in “Central Electricity Authority (Measures relating to Safety and Electric Supply) Regulations, 2023” to identify the necessary documents and attach them accordingly before proceeding with the form submission. Ensuring that all required documents/ Annexure are properly prepared/ filled and attached will facilitate a smoother application process and prevent any delays or rejections. Desired documents/ detail specifically required to be filled or supplied is detailed below:
1) List of equipment mention the data: (Name, Make, Sr. No., MW/KW, KVA, Quantity).
2) Single line diagram with metering & protection.
3) Drawing showing the location, layout, elevation and section.
4) Drawing of earthing with Electrodes/Mats.
5) Manufacturer’s test certificate for each equipment.
6) Insulation test results and earth resistance of individual, combined electrodes and earthmat.
7) Details of electrical Contractor and Supervisor (enclose copy).
8) Copy of treasury Challan receipt.
9) Copy of NOC from supplier in case of D.G. set to be commissioned as standby source of supply.
File Name | Download |
---|---|
FORM-I "FORM FOR APPROVAL TO ENERGISE ELECTRICAL INSTALLATIONS OF VOLTAGE UP TO AND INCLUDING 250 V" | Download Now |
FORM-II "FORM FOR APPROVAL TO ENERGISE ELECTRICAL INSTALLATIONS OF VOLTAGE LEVEL MORE THAN 250V AND INCLUDING 650V" | Download Now |
FORM-III "FORM FOR APPROVAL TO ENERGISE ELECTRICAL INSTALLATIONS OF VOLTAGE EXCEEDING 650V" | Download Now |
FORM-IV "FORM FOR APPROVAL TO ENERGISE ELECTRICAL INSTALLATIONS IN MINES" | Download Now |